Source Material & Data Provenance
Source Library & Questionnaire Tracker
20 uploaded files across 7 categories — every assumption traces back to a verified source.
IEC Electricity Bills
8 files| File | Site / Account | Date | Summary | Informs | Link |
|---|---|---|---|---|---|
PDFBill_2025430366910.pdf | Kiryat Gat (342128421) | Feb 2025 | 62,560 kWh, 3,010 KVA, ₪45,871 — blended 56.13 ag/kWh, net-metering credit 17,120 kWh | Tariff, demand charge, net metering | Open |
PDFBill_2026430188609.pdf | Ein Carmel (340851577) | Jan 2026 | 15,552 kWh, 218 KVA, ₪12,299 — blended 56.98 ag/kWh, net-metering credit | Tariff, demand charge | Open |
PDFBill_20254310362681.pdf | Kiryat Gat (342128421) | Early 2025 | Monthly IEC invoice — Kiryat Gat low-voltage TAOZ | Tariff | — |
PDFBill_2025431036268.pdf | Kiryat Gat (342128421) | Early 2025 | Monthly IEC invoice — Kiryat Gat low-voltage TAOZ | Tariff | — |
PDFBill_2025451589028.pdf | Kiryat Gat (342128421) | Mid 2025 | Monthly IEC invoice — Kiryat Gat low-voltage TAOZ | Tariff | — |
PDFBill_2025460911922.pdf | Kiryat Gat (342128421) | Mid 2025 | Monthly IEC invoice — Kiryat Gat low-voltage TAOZ | Tariff | — |
PDFBill_2025461406072.pdf | Kiryat Gat (342128421) | Mid 2025 | Monthly IEC invoice — Kiryat Gat low-voltage TAOZ | Tariff | — |
PDFBill_2025470222445.pdf | Kiryat Gat (342128421) | Late 2025 | Monthly IEC invoice — Kiryat Gat low-voltage TAOZ | Tariff | — |
Hourly Load Data
2 files| File | Site / Account | Date | Summary | Informs | Link |
|---|---|---|---|---|---|
CSV2025QLC.csv | Kiryat Gat (342128421) | 2025 (8,760 hrs) | Hourly active-energy consumption — 2,450,035 kWh/yr, peak 1,030 kW | Load profile, EUI, peak/off-peak split | Open |
CSVxlsx-Sheet1.csv | Kiryat Gat (342128421) | 2025 (8,760 hrs) | Hourly load profile — cross-check variant of 2025QLC.csv | Load profile (cross-check) | Open |
Tariff Schedules
1 file| File | Site / Account | Date | Summary | Informs | Link |
|---|---|---|---|---|---|
XLSXdata6.xlsx | Kiryat Gat (342128421) | Jan–Apr 2026 | Monthly peak/off-peak/non-TAOZ (פסגה/שפל/לא-תעוז) charge breakdown | TAOZ seasonal tariff split | Open |
Site Registry
1 file| File | Site / Account | Date | Summary | Informs | Link |
|---|---|---|---|---|---|
XLSXNationalFCSitesActiveIECAccounts.xlsx | 9 FC accounts | 2026 | Active IEC accounts: Ein Carmel, 2× Kiryat Gat, 4× Kannot, Karmiel | Portfolio sites, account numbers, KVA | Open |
Engineering Drawings
2 filesSite Maps (Govmap)
5 files| File | Site / Account | Date | Summary | Informs | Link |
|---|---|---|---|---|---|
PNGFLYINGCARGOKIRYATGAT1.png | Kiryat Gat | May 2026 | Govmap aerial — HaBarzel 3, Kiryat Gat industrial zoning (1:1,000) | Site footprint, rooftop solar | Open |
PNGFLYINGCARGOKIRYATGAT2.png | Kiryat Gat | May 2026 | Govmap aerial — parcel boundaries, existing rooftop solar (1:2,000) | Site footprint, adjacent plots | Open |
PNGFLYINGCARGOKIRYATGAT3.png | Kiryat Gat | May 2026 | Govmap aerial — loading docks, storage tanks (1:2,000) | Site infrastructure | Open |
PNGFLYINGCARGOKIRYATGAT4.png | Kiryat Gat | May 2026 | Govmap aerial — main warehouse, loading bay (1:500) | Site footprint | Open |
PNGFLYINGCARGOKIRYATGAT5.png | Kiryat Gat | May 2026 | Govmap aerial — cadastral parcels, existing PV arrays (1:1,000) | Site footprint, existing solar | Open |
Data-Request Questionnaire
1 file| File | Site / Account | Date | Summary | Informs | Link |
|---|---|---|---|---|---|
PDFV2-.pdf | Kiryat Gat | 15 Aug 2026 | Required-data form (Moshe Cohen & Daniel Schwab) — connection, generators, solar, storage, load, pricing, parking, vehicles, gas | Data collection template | Open |
Data-Request Questionnaire Tracker
8/17 fields answeredV2-.pdf (15 Aug 2026, Moshe Cohen & Daniel Schwab) — required data for the F.C. Kiryat Gat site. Status reflects which fields the uploaded sources already cover.
Existing connection size (KVA, A, feeders, backup)
Answered — IEC bills (Kiryat Gat 3,010 KVA, Ein Carmel 218 KVA)
Electricity supplier & supply agreements
Answered — IEC bills (חח"י / IEC low-voltage TAOZ)
Existing generators (capacity, fuel, dispatch)
Outstanding — awaiting data
Existing solar systems (approved capacity, DC/AC, backup mode)
Answered — Govmap imagery (rooftop PV visible on Kiryat Gat)
Existing energy storage systems (kWh capacity)
Outstanding — awaiting data
Future planned solar/storage installations
Outstanding — awaiting data
Single-line diagram & main switchboard layout
Answered — Engineering drawing 22-002648-26.pdf
15-minute / hourly load readings (full facility)
Answered — 2025QLC.csv (8,760 hourly readings, 2025)
Building & electrical room floor plans, rooftops
Answered — Engineering drawings + Govmap aerial imagery
12-month pricing data (hourly/quarter-hourly, import & export)
Answered — IEC bills (8 months) + data6.xlsx (peak/off-peak split)
Existing energy management systems & software
Outstanding — awaiting data
Existing reports (consumption, demand peaks, power quality, faults)
Outstanding — awaiting data
Parking area (total, spaces, occupancy, hours)
Outstanding — awaiting data
Vehicles (types, counts, EV charging, dwell time, mileage)
Outstanding — awaiting data
Adjacent plots (location, size, designation, acquisition timeline)
Answered — Govmap imagery (cadastral parcels, adjacent lots visible)
Natural-gas connection plans
Outstanding — awaiting data
Future expansion plans (5-yr, 10-yr, load growth)
Outstanding — awaiting data