Source Material & Data Provenance

Source Library & Questionnaire Tracker

20 uploaded files across 7 categories — every assumption traces back to a verified source.

IEC Electricity Bills
8 files
FileSite / AccountDateSummaryInformsLink
PDFBill_2025430366910.pdf
Kiryat Gat (342128421)Feb 202562,560 kWh, 3,010 KVA, ₪45,871 — blended 56.13 ag/kWh, net-metering credit 17,120 kWhTariff, demand charge, net metering Open
PDFBill_2026430188609.pdf
Ein Carmel (340851577)Jan 202615,552 kWh, 218 KVA, ₪12,299 — blended 56.98 ag/kWh, net-metering creditTariff, demand charge Open
PDFBill_20254310362681.pdf
Kiryat Gat (342128421)Early 2025Monthly IEC invoice — Kiryat Gat low-voltage TAOZTariff—
PDFBill_2025431036268.pdf
Kiryat Gat (342128421)Early 2025Monthly IEC invoice — Kiryat Gat low-voltage TAOZTariff—
PDFBill_2025451589028.pdf
Kiryat Gat (342128421)Mid 2025Monthly IEC invoice — Kiryat Gat low-voltage TAOZTariff—
PDFBill_2025460911922.pdf
Kiryat Gat (342128421)Mid 2025Monthly IEC invoice — Kiryat Gat low-voltage TAOZTariff—
PDFBill_2025461406072.pdf
Kiryat Gat (342128421)Mid 2025Monthly IEC invoice — Kiryat Gat low-voltage TAOZTariff—
PDFBill_2025470222445.pdf
Kiryat Gat (342128421)Late 2025Monthly IEC invoice — Kiryat Gat low-voltage TAOZTariff—
Hourly Load Data
2 files
FileSite / AccountDateSummaryInformsLink
CSV2025QLC.csv
Kiryat Gat (342128421)2025 (8,760 hrs)Hourly active-energy consumption — 2,450,035 kWh/yr, peak 1,030 kWLoad profile, EUI, peak/off-peak split Open
CSVxlsx-Sheet1.csv
Kiryat Gat (342128421)2025 (8,760 hrs)Hourly load profile — cross-check variant of 2025QLC.csvLoad profile (cross-check) Open
Tariff Schedules
1 file
FileSite / AccountDateSummaryInformsLink
XLSXdata6.xlsx
Kiryat Gat (342128421)Jan–Apr 2026Monthly peak/off-peak/non-TAOZ (פסגה/שפל/לא-תעוז) charge breakdownTAOZ seasonal tariff split Open
Site Registry
1 file
FileSite / AccountDateSummaryInformsLink
XLSXNationalFCSitesActiveIECAccounts.xlsx
9 FC accounts2026Active IEC accounts: Ein Carmel, 2× Kiryat Gat, 4× Kannot, KarmielPortfolio sites, account numbers, KVA Open
Engineering Drawings
2 files
FileSite / AccountDateSummaryInformsLink
PDF22-002648-26.pdf
Kiryat GatJun 2025Architectural/engineering drawing — project 017101, scale 1:250Site layout, single-line diagram Open
PDF1151-tnua-05.pdf
Kiryat Gat2022–2024Drawing revision/transaction register (tnua ledger)Drawing revisions Open
Site Maps (Govmap)
5 files
FileSite / AccountDateSummaryInformsLink
PNGFLYINGCARGOKIRYATGAT1.png
Kiryat GatMay 2026Govmap aerial — HaBarzel 3, Kiryat Gat industrial zoning (1:1,000)Site footprint, rooftop solar Open
PNGFLYINGCARGOKIRYATGAT2.png
Kiryat GatMay 2026Govmap aerial — parcel boundaries, existing rooftop solar (1:2,000)Site footprint, adjacent plots Open
PNGFLYINGCARGOKIRYATGAT3.png
Kiryat GatMay 2026Govmap aerial — loading docks, storage tanks (1:2,000)Site infrastructure Open
PNGFLYINGCARGOKIRYATGAT4.png
Kiryat GatMay 2026Govmap aerial — main warehouse, loading bay (1:500)Site footprint Open
PNGFLYINGCARGOKIRYATGAT5.png
Kiryat GatMay 2026Govmap aerial — cadastral parcels, existing PV arrays (1:1,000)Site footprint, existing solar Open
Data-Request Questionnaire
1 file
FileSite / AccountDateSummaryInformsLink
PDFV2-.pdf
Kiryat Gat15 Aug 2026Required-data form (Moshe Cohen & Daniel Schwab) — connection, generators, solar, storage, load, pricing, parking, vehicles, gasData collection template Open
Data-Request Questionnaire Tracker
8/17 fields answered

V2-.pdf (15 Aug 2026, Moshe Cohen & Daniel Schwab) — required data for the F.C. Kiryat Gat site. Status reflects which fields the uploaded sources already cover.

Existing connection size (KVA, A, feeders, backup)
Answered — IEC bills (Kiryat Gat 3,010 KVA, Ein Carmel 218 KVA)
Electricity supplier & supply agreements
Answered — IEC bills (חח"י / IEC low-voltage TAOZ)
Existing generators (capacity, fuel, dispatch)
Outstanding — awaiting data
Existing solar systems (approved capacity, DC/AC, backup mode)
Answered — Govmap imagery (rooftop PV visible on Kiryat Gat)
Existing energy storage systems (kWh capacity)
Outstanding — awaiting data
Future planned solar/storage installations
Outstanding — awaiting data
Single-line diagram & main switchboard layout
Answered — Engineering drawing 22-002648-26.pdf
15-minute / hourly load readings (full facility)
Answered — 2025QLC.csv (8,760 hourly readings, 2025)
Building & electrical room floor plans, rooftops
Answered — Engineering drawings + Govmap aerial imagery
12-month pricing data (hourly/quarter-hourly, import & export)
Answered — IEC bills (8 months) + data6.xlsx (peak/off-peak split)
Existing energy management systems & software
Outstanding — awaiting data
Existing reports (consumption, demand peaks, power quality, faults)
Outstanding — awaiting data
Parking area (total, spaces, occupancy, hours)
Outstanding — awaiting data
Vehicles (types, counts, EV charging, dwell time, mileage)
Outstanding — awaiting data
Adjacent plots (location, size, designation, acquisition timeline)
Answered — Govmap imagery (cadastral parcels, adjacent lots visible)
Natural-gas connection plans
Outstanding — awaiting data
Future expansion plans (5-yr, 10-yr, load growth)
Outstanding — awaiting data