Constraints & Feasibility
Physical, Regulatory & Grid Limits
Per-site constraints that bound the deployable envelope and feed the optimizer.
Sites Evaluated
10
Breaches
1
Warnings
3
Overall Status
INFEASIBLE
1 site(s) breach one or more constraints
Kiryat Gat (HaBarzel 11) — reduce solar/BESS per site or add sites to stay within limits.
PHYSICAL AREA
Surface utilization (rooftop + ground) PASS
41.5% utilizedlimit 39,060 sqm
Max solar by area: 4.9 MWp PERMITTING
Installed capacity vs regulatory cap PASS
40% utilizedlimit 5 MW
Solar: 2.0 MWp · cap 5 MWp GRID INTERCONNECTION
Generation vs substation capacity WARN
87.5% utilizedlimit 8 MW
Solar 2.0 + CCGT 5.0 = 7.0 MW · export cap 3 MWConstraint model: Solar footprint 8,000 sqm/MWp · BESS 50 sqm/MWh · permitting cap 5 MWp/site · grid export 3 MW/site · substation headroom 5–8 MW (24/36 kV). When enforcement is ON, the optimizer discards any candidate that breaches.