FC
Flying Cargo · Energy Sovereignty
Executive Energy Modeler
Technical Bill of Materials

Engineering BOM & Procurement Schedule

Line-item costing across 29 components, scaled to the active scenario.

Solar PV
₪50.5M
5 line items
BESS Storage
₪72.2M
5 line items
Modular DC
₪47.5M
5 line items
V2G Fleet
₪8.9M
3 line items
Gas Generation
₪70.2M
4 line items
Balance of Plant
₪9.5M
3 line items
EPC & Soft Costs
₪36.2M
4 line items
Total Procurement & Implementation
₪295.0M
CategoryComponentSpecificationQtyUnit Cost (₪)Total (₪)
Solar PVBifacial PV Modules550W Tier-136,364950₪34,545,800
Solar PVString Inverters100 kVA16045,000₪7,200,000
Solar PVMounting StructureRooftop + ground20280,000₪5,600,000
Solar PVDC Cabling & CombinersPer MWp2095,000₪1,900,000
Solar PVSCADA & MonitoringPer MWp2065,000₪1,300,000
BESS StorageLiFePO4 Battery Racks1 MWh blocks40850,000₪34,000,000
BESS StorageBidirectional PCS500 kVA80280,000₪22,400,000
BESS StorageBMS & EMSPer MWh40120,000₪4,800,000
BESS StorageContainer & HVACPer MWh40180,000₪7,200,000
BESS StorageFire SuppressionPer MWh4095,000₪3,800,000
Modular DCIT Racks & ServersPer kW IT5,0004,200₪21,000,000
Modular DCPrecision Cooling (CRAC)Per kW5,0002,100₪10,500,000
Modular DCUPS & PDUPer kW5,0001,500₪7,500,000
Modular DCContainer EnclosurePer kW5,0001,200₪6,000,000
Modular DCClean Agent Fire SuppressionPer kW5,000500₪2,500,000
V2G FleetBidirectional Charger11 kW V2G23428,000₪6,552,000
V2G FleetInstallation & Grid SyncPer vehicle2346,500₪1,521,000
V2G FleetV2G Controller & SoftwarePer vehicle2343,500₪819,000
Gas GenerationCCGT Turbine GeneratorPer MW203,200,000₪64,000,000
Gas GenerationGas Connection & PipingPer gas site4850,000₪3,400,000
Gas GenerationGas Compressor & MeteringPer gas site4420,000₪1,680,000
Gas GenerationEmissions & CEMSPer gas site4280,000₪1,120,000
Balance of PlantMV Switchgear & TransformerPer site10320,000₪3,200,000
Balance of PlantGrid Interconnection & MeteringPer site10180,000₪1,800,000
Balance of PlantCivil & Electrical WorksPer site10450,000₪4,500,000
EPC & Soft CostsEngineering & DesignPer site10220,000₪2,200,000
EPC & Soft CostsPermits & Grid StudiesPer site10140,000₪1,400,000
EPC & Soft CostsCommissioning & TestingPer site1095,000₪950,000
EPC & Soft CostsEPC Margin & Project Management12% of hardware131,606,536₪31,606,536
    base44